New Asphalt Paving in Saint Joseph
Full-depth asphalt construction for Stockyards District industrial yards, Belt Highway retail developments, and institutional lots at Missouri Western State University—built on Buchanan County's variable alluvial subgrades.
- 8–12-inch aggregate base lifts compacted to 98% Modified Proctor on alluvial soils
- PG 64-22 or PG 70-22 binder selection matched to Saint Joseph's truck load spectrum
- HMA placed at 290–310°F with nuclear density verification on every lift
- Full geotechnical subgrade assessment for river-bottom and hillside sites