New Asphalt Paving in Peculiar
Peculiar's Design District outparcels and I-49 interchange pads need structural pavement built to handle delivery-vehicle cycles from day one. We install full-depth HMA sections on properly stabilized Cass County clay.
- 6–8-inch compacted aggregate base over lime-stabilized clay subgrade
- 2.5-inch SP-19 binder course placed at 290°F minimum mat temperature
- 1.5-inch SP-9.5 surface course compacted to 93% Marshall density
- Engineered crown or cross-slope at 2% minimum for positive lot drainage