New Asphalt Paving in Leavenworth
Full-depth parking lot installs engineered for Leavenworth's glacial till subgrade and the heavy daily truck traffic generated by Fort Leavenworth logistics operations and US-73 commercial zones.
- 6–8 inches of compacted crusite aggregate base over scarified glacial till subgrade
- Hot-mix asphalt placed at 290–320°F in 2-inch lifts for density control
- Nuclear density gauge verification targeting 93–96% compaction per lift
- Crown slopes graded at 2% minimum for positive drainage toward catch basins