New Asphalt Paving in Eudora
Eudora's commercial growth is generating new lot construction along K-10 and at Intech Business Park. We engineer full-depth sections on Douglas County's shale-over-clay profile to deliver 20-year performance from day one.
- 8–12-inch aggregate base lifts compacted to 95% Modified Proctor on Eudora clay subgrade
- PG 64-22 binder course at 2.5 inches with 300°F minimum mat temperature at laydown
- Surface course at 1.5 inches using 9.5 mm Superpave HMA for K-10 retail traffic loads
- Nuclear density testing every 200 tons to verify 92–96% compaction on every lift