New Asphalt Paving in De Soto
Astra Enterprise Park and the K-10 corridor are adding millions of square feet of new commercial surface. We build full-depth sections engineered for the heavy industrial loads headed De Soto's way.
- Full-depth 6–8" compacted limestone base over geotextile on Johnson County clay
- 3–4" HMA surface lifts placed at 290–310°F for maximum density
- Nuclear density testing to verify 95%+ compaction on every lift
- Crown and slope grading designed for high-volume stormwater runoff