New Asphalt Paving in Atchison
Full-depth construction for new commercial lots along the US-59 corridor and Atchison Industrial Park. We design base and binder lifts to handle alluvial soil movement and heavy truck loads unique to this river city.
- 8–12 inches of compacted aggregate base over stabilized alluvial subgrade
- Hot-mix asphalt placed at 290–310°F for optimal binder adhesion
- Nuclear density testing to verify 95%+ compaction on every lift
- Slope grading engineered for bluff-side lots with 2% minimum cross-pitch